• shop drawings, slab plans, metal
    framing plans,and the metal skin of the
    building; all drawings were provided by S|A
    for use in the erection of the building. BIM
    parametrics were utilized tailoring to variables
    such as the size, number, color, and type of
    panel to be installed on the building.
    more on project…