• STENFORS ASSOCIATES ARCHITECTS
  • PROJECTS
  • NEWS
  • CONTACT
  • FIRM PROFILE
  • FTP ACCESS
  • SKETCHES
  •  
  • NIST WESTERN
    INSTITUTE OF
    NANOTECHNOLOGY
  • Programming, Site Planning & Concept
    Design Architecture: stenforS|Associates
    Structural Engineers: Englekirk & Sabol
    MEP: IBE Consulting Engineers
  • As part of a grant application to National
    Institute of Standards & Technology (NIST),
    S|A was hired to quickly program, design
    and determine costs for for the WIN-GEM
    and Engineering VI site. S|A briskly worked
    with Capital Programs, HSSEAS and their
    consulting engineers to design an optimal
    solution in a very tight time frame to meet
  • the deadline. The resulting conceptual
    design for the 35,000 SF Western Institute
    of Nanolectronics on Green Engineering
    and Metrology (WIN-GEM) Facility at UCLA
    provides a temperature-stabilized, low-
    vibration, low electromagnetic field building
    designed to meet the needs of 21st
    century clean- tech research.

  • Share this:
  • Twitter
  • Share
  • Email
  • Print
  • Reddit
  • StumbleUpon
  • Digg
  • BACK TO PROJECTS PAGE
  • BACK TO HOME PAGE
  • © 2011 All Rights Reserved
  • FOLLOW US
  •