STENFORS ASSOCIATES ARCHITECTS
PROJECTS
NEWS
CONTACT
FIRM PROFILE
FTP ACCESS
SKETCHES
WILDWOOD II
New school, Site development, Parking
80,000 SF
Architect: stenforS|Associates
Methane Engineering: Glenn Tofani
Cost Estimator: Ciaran O’Halloran
Wildwood’s inimitable success and desire
for greenspace led to S|A’s assignment to
fashion their unique educational approach
into a new structure. The school building is
compacted to preserve landscape and
minimize building footprint area. The class-
rooms are cloistered around botanical
courtyards.The building takes advantage
of prevailing ocean breezes and natural
light throughout. The natural ventilated
parking is hidden below and landscaped
at the perimeter. This moat of landscape
provides a natural security barrier without
the use of fences. The zeppelin main
entrance to the south exhibits a public
theatre and the school lobby.
Share this:
Twitter
Share
Email
Print
Reddit
StumbleUpon
Digg
BACK TO PROJECTS PAGE
BACK TO HOME PAGE
© 2011 All Rights Reserved
FOLLOW US